Skip to content
KitchenDecorate

Find a pro

Getting a quote you can actually compare

The short answer

Three contractors quoting three different jobs is not three quotes — it is three guesses. The way to get comparable numbers is to hand every one of them the same written scope: what changes, what stays, what you are buying yourself, and which measurements are still unconfirmed.

What we do and do not do

KitchenDecorate has no contractor partner network. We do not collect your details, we do not pass them to a lead broker, and we will never tell you that contractors have been contacted when they have not been. No lead storage and no contractor partner are configured, so this site does not collect contact details for quotes at all.

What we can do is the part most homeowners find hardest: writing the brief. The builder below produces a document you download or copy, and you send it to whoever you choose.

What belongs in a kitchen brief

  1. 01The scope, stated as changes

    "Tile the backsplash from the counter to the underside of the uppers, cutting around four outlets" beats "redo the backsplash". A quote is only as precise as the sentence it answers.

  2. 02What is staying

    Listing what does not change is as important as listing what does. It stops a contractor pricing in a cabinet replacement you never wanted.

  3. 03Who buys the materials

    Say it explicitly. Supply-and-fit and labour-only are different numbers, and comparing one against the other is the most common reason quotes look wildly different.

  4. 04Your budget band, not a secret

    Withholding the budget wastes everybody’s time. A band lets a contractor tell you early whether the job is feasible at that number.

  5. 05The measurements you have and the ones you do not

    Being honest about what is unconfirmed is better than supplying a number you guessed. Every quote should be conditional on a site visit anyway.

  6. 06Constraints

    Renting, no electrical work, a building with restricted hours, a lease clause. These change the job, and they change it before the quote rather than after.

Build your brief

This runs entirely in your browser. Nothing is submitted, stored on a server or sent to anyone.

Which trades are involved?
KITCHEN PROJECT BRIEF
Prepared by the homeowner using KitchenDecorate.

WHAT I WANT DONE
  (describe the work in your own words)

BUDGET
  Band: Moderate upgrade ($250 – $1,000)
  This band covers materials I intend to buy myself. Labour is quoted separately.

TIMELINE
  within 3 months

HOW I WOULD LIKE THE QUOTE
  Itemised by task, with materials and labour separated.
  Please state clearly what is excluded.
  Please confirm every dimension on site — I have not had the space surveyed.

NOTES
  This brief describes intent, not a construction document.
  It carries no drawings, no structural review and no code approval.

Everything above stays in this browser. No contact details are requested and nothing is transmitted.

Start from a design rather than a blank page

If you run your kitchen through the Studio first, the brief fills itself in — scope, what stays, palette and measurements all come straight from the plan.

Design my kitchen first

Nothing on this page is a construction document. A design brief describes intent; a contractor is responsible for structural assessment, permits and code compliance. Always confirm licensing and insurance before work starts.